Bidding Report
(4 items)
입찰 프로젝트 명칭 (Project name) | Denmark – Construction work – Hesselø Offshore Wind Farm | ||
구분 (Classification) | 공사 (Works) | ||
EU 입찰번호 (Reference no.) | 774658-2025 | 발주처 (Buyer) | Danish Energy Agency |
EU 입찰 식별번호 (CPV no.) | 45000000 Construction work, 31121320 Wind turbines, 31121330 Wind turbine generators, 31121340 Wind farm, 31160000 Parts of electric motors, generators and transformers, 31170000 Transformers, 31213400 Distribution system, 31300000 Insulated wire and cable, 45244000 Marine construction works, 45244100 Marine installations | ||
입찰서류 작성언어 (Bidding document language) | 영어 (English) | 사업지역 (Business location) | Copenhagen |
입찰 추정가 (Estimated value in DKK) | 21,900,000,000 DKK (VAT 제외 /exempt) | 계약기간 (Duration) | 480 개월(months) |
공고 게시일 (Announcement date) | 21 November 2025 | 신청마감일 (Application deadline) | 20 May 2026, 12:00 현지시간 (Local time) |
내 용 (Short description) | |||
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named Hesselø, pursuant to the directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. The Concessionaire is granted a right and obligations to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 800 MWh for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the concessionaire of Hesselø Offshore Wind Farm, will be economically supported for the electricity produced from the minimum capacity by a capability based two-way contract for difference (“CfD”) scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the “bid price” of the Successful Tenderer) is lower than the reference price (to be calculated by the DEA as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or “Available Active Power” as further set out in the procurements material). | |||
관련 페이지 (link) | |||
입찰 프로젝트 명칭 (Project name) | Denmark – Construction work – North Sea I, South, Offshore Wind Farm | ||
구분 (Classification) | 공사 (Works) | ||
EU 입찰번호 (Reference no.) | 774914-2025 | 발주처 (Buyer) | Danish Energy Agency |
EU 입찰 식별번호 (CPV no.) | 45000000 Construction work, 31121320 Wind turbines, 31121330 Wind turbine generators, 31121340 Wind farm, 31160000 Parts of electric motors, generators and transformers, 31170000 Transformers, 31213400 Distribution system, 31300000 Insulated wire and cable, 45244000 Marine construction works, 45244100 Marine installations | ||
입찰서류 작성언어 (Bidding document language) | 영어 (English) | 사업지역 (Business location) | Copenhagen |
입찰 추정가 (Estimated value in DKK) | 6,600,000,000 DKK (VAT 제외 /exempt) | 계약기간 (Duration) | 480 개월(months) |
공고 게시일 (Announcement date) | 21 November 2025 | 신청마감일 (Application deadline) | 23 October 2028, 12:00 현지시간 (Local time) |
내 용 (Short description) | |||
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named North Sea I, South, pursuant to the directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. The Concessionaire is granted a right and obligations to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 1 GW for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the concessionaire of North Sea I, South Offshore Wind Farm, will be economically supported for the electricity produced from the minimum capacity by a capability based two-way contract for difference (“CfD”) scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the “bid price” of the Successful Tenderer) is lower than the reference price (to be calculated by the DEA as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or “Available Active Power” as further set out in the procurements material). There is no cap on the payments from the Concessionaire to the Danish State, and the Concessionaire has no option to opt out of the capability-based two-way CfD scheme. Correspondingly, in months where the strike price is higher than the reference price, the Concessionaire will receive subsidies up to cap of 6.6 billion DKK excl. VAT (2025-prices) in the form of payments from the Danish State. | |||
관련 페이지 (link) | |||
입찰 프로젝트 명칭 (Project name) | Denmark – Construction work – North Sea I, Mid, Offshore Wind Farm | ||
구분 (Classification) | 공사 (Works) | ||
EU 입찰번호 (Reference no.) | 775013-2025 | 발주처 (Buyer) | Danish Energy Agency |
EU 입찰 식별번호 (CPV no.) | 45000000 Construction work, 31121320 Wind turbines, 31121330 Wind turbine generators, 31121340 Wind farm, 31160000 Parts of electric motors, generators and transformers, 31170000 Transformers, 31213400 Distribution system, 31300000 Insulated wire and cable, 45244000 Marine construction works, 45244100 Marine installations | ||
입찰서류 작성언어 (Bidding document language) | 영어 (English) | 사업지역 (Business location) | Copenhagen |
입찰 추정가 (Estimated value in DKK) | 15,700,000,000 DKK (VAT 제외 /exempt) | 계약기간 (Duration) | 480 개월(months) |
공고 게시일 (Announcement date) | 21 November 2025 | 신청마감일 (Application deadline) | 20 May 2026, 12:00 현지시간 (Local time) |
내 용 (Short description) | |||
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named North Sea I, Mid, pursuant to the directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. The Concessionaire is granted a right and obligations to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 1 GW for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the concessionaire of North Sea I, Mid Offshore Wind Farm, will be economically supported for the electricity produced from the minimum capacity by a capability based two-way contract for difference (“CfD”) scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the “bid price” of the Successful Tenderer) is lower than the reference price (to be calculated by the DEA as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or “Available Active Power” as further set out in the procurements material). There is no cap on the payments from the Concessionaire to the Danish State, and the Concessionaire has no option to opt out of the capability-based two-way CfD scheme. Correspondingly, in months where the strike price is higher than the reference price, the Concessionaire will receive subsidies up to cap of 15.7 billion DKK excl. VAT (2025-prices) in the form of payments from the Danish State. | |||
관련 페이지 (link) | |||
입찰 프로젝트 명칭 (Project name) | Denmark, Sweden – Geotechnical engineering services – Cable Burial and Protection to Konti-Skan Connect | ||
구분 (Classification) | 서비스 (Services) | ||
EU 입찰번호 (Reference no.) | 791606-2025 | 발주처 (Buyer) | Energinet Eltransmission A/S |
EU 입찰 식별번호 (CPV no.) | 71332000 Geotechnical engineering services | ||
입찰서류 작성언어 (Bidding document language) | 영어 (English) | 사업지역 (Business location) | Fredericia |
입찰 추정가 (Estimated value in DKK) | 500,000 EUR (VAT 제외 /exempt) | 계약기간 (Duration) | 108 개월(months) |
공고 게시일 (Announcement date) | 28 November 2025 | 신청마감일 (Application deadline) | 8 January 2026, 11:00 현지시간 (Local time) |
내 용 (Short description) | |||
As part of the current project development phase, Energinet and Svenska kraftnät (the Clients) are jointly undertaking the Konti-Skan Connect HVDC Interconnector project to renew and modernize the electricity transmission link between Denmark and Sweden. The Consultant is requested to provide engineering services that support the development of a comprehensive cable protection strategy. This includes evaluating seabed conditions, human activity (e.g., anchoring, fishing), and geotechnical risks to ensure the cables are safeguarded against foreseeable hazards throughout their operational lifespan. In addition, the Consultant shall incorporate a Security by Design assessment as a complementary layer to the Cable Protection and Burial Study, specifically addressing risks related to Hybrid Warfare at Sea. This assessment should enhance the overall protection strategy by ensuring resilience against emerging and unconventional threats beyond conventional activity risks. The tender is divided into the following: • Work Package A – Part One – Preliminary Risk Based Cable Protection Design Study • Work Package A – Part Two – Shoreline Morphology and Cable Burial Assessment at Sæby Beach Landfall • Work Package B – Revised threat and risk assessment • Work Package C – Assessment of cable installation methods • Option - Work Package D – Client´s engineer, cable tender phase • Option – Work Package E – Client´s engineer, cable installation phase For further details regarding the purchase, reference is made to the tender documents. The tendered contract has a duration of 9 years until 1. December 2034. The contract is task-based, and it will be possible to extend the duration of the contract until the task has been completed satisfactorily for the Client. The value of the contract is expected to amount to 500,000 EURO. | |||
관련 페이지 (link) | |||